This is another picture of my field I had system tiled when a neighbor had the contractor out to tile his farm. The lateral tile lines are spaced 100 feet apart. Many fields now are tiled with laterals 50 feet apart. When you system tile a farm with 100-foot laterals it costs about $500 an acre. I have another field that is not system tiled yet. So, I plan on getting all my land tiled with 100-foot laterals first. Then I can come back and put tile lines between the existing 100-foot laterals to end up with 50-foot spacing.